A Selection of Recent Projects

Beckley Court

Trident worked together with Kier Construction to develop a practical fire safety risk assessment for the construction phase of this new 23 storey block in Plymouth.

Our scope of works was increased to include an assessment of the risks resulting from external construction operations carried out after handover.

Tasen Tunnels

Trident was employed by PassiveTec to develop practical solutions for installing fire protection boards to upgrade the performance of the existing Tasen Tunnels in Oslo, Norway.

Services included site inspections coupled with draft CAD details for the proposed solutions

Bristol Airport

Trident was employed by Balfour Beatty Construction to carry out intrusive surveys within the new constructed West Terminal Extension.

Works included inspection of installed firestopping and fire doors.

Non-compliance items were identified and remedied to ensure all works would perform as specified.

Facebook Data Centre

Trident was employed by PFP Ireland to carry out a review of installed firestopping systems in this high profile data centre on the outskirts of Dublin.

Services included site inspections and draft CAD details of proposed fire compartmentation solutions.

Waldorf Hotel London

Trident was employed by Hilton Worldwide to carry out a number of site inspections with regard to fire compartmentation measures in the prestigious London hotel.

Services included training and inspection of non-third party accredited companies coupled with intrusive surveys of both existing fire compartmentation and fire doors.

Tate St Ives

Trident was employed by DDF to inspect all their passive fire protection works within the new extension to confirm compliance with the project specification

UKHO Taunton

Trident are employed by BAM Construction on this prestigious new extension to the UK Hydrographic Office.

Services include compliance inspections of cavity barriers, firestopping and fire doors coupled with engineered judgements for bespoke problematic details.

Western Community Hospital

Trident were employed by Solent NHS Trust to develop a number of engineered solutions to problematic details with regard to fire compartmentation issues within the Minstead Ward Refurbishment project.

Heathrow Road Tunnels

Trident were employed by PassiveTec to develop practical solutions for the fire protection linings to the existing road and side bore tunnels that form an essential link to Heathrow Airport

Hilton Hotel Ageas Bowl

Trident were employed by Hilton Worldwide to carry out intrusive site inspections of the installed fire compartmentation measures in this luxury hotel